WIYN T&E PLANS 2014
November 3-4, 2014 Generic T&E
**Note no unusual KPNO resources needed**
Plans for November 3:
Daytime:
- No activities planned
Nighttime:
- WTTM focus GUI testing (Jayadev/Corson with Behzad available for consult) [Sunset to ~9pm]
- Collimation check, ODI wavefronting, lookup tables (Corson/Harbeck/OA)
Plans for November 4:
Daytime:
- No activities planned
Nighttime:
- Contingency for collimation/wavefronts/lookup tables (Corson/Harbeck/OA)
- Continuation of WTTM focus GUI testing (Jayadev)
- Star tracker test with WHIRC and ODI (Jayadev/Schweiker)
October 6-10, 2014 T&E
Plans for October 6:
Daytime:
- Instrument change from Hydra to IAS (Corson et al)
- ODI computers (Bob)
Nighttime:
- No on-sky activities
Plans for October 7:
Daytime:
- Instrument change from Hydra to IAS, IAS checkout (Corson et al)
- ODI computers (Bob)
Nighttime:
- IAS checkout??
Plans for October 8:
Daytime:
- Collimation (Corson et al)
Nighttime:
- Collimation activities continued (Corson et al)
Plans for October 9:
Daytime:
- No plans
Nighttime:
- 1st 1/2 WHIRC focus testing (Jayadev, Heidi, Behzad)
- 2nd 1/2 ??
Plans for October 10:
Daytime:
- No plans
Nighttime:
- ODI & Star Tracker testing
September 5, 8, 11, 2014
Plans for September 5:
Daytime:
- Contingency for any shutdown tasks
- pODI functionality testing
Nighttime:
- Contingency for any remaining shutdown tasks
- 1st 1/2 - pODI functionality testing
- 2nd 1/2 - If contingency time is not needed and all pODI testing is complete, give to Hydra observer Shporer
Plans for September 8:
Daytime:
- No T&E activities planned
Nighttime:
- 1st 1/2 - pODI testing (functionality, star tracker testing, optical quality, photometry)
- 2nd 1/2 - If time remains after pODI testing, give to Hydra observer Shporer
Plans for September 11:
Daytime:
- No T&E activities planned
Nighttime:
- 1st 1/2 - pODI testing (functionality, star tracker testing, optical quality, photometry)
- 2nd 1/2 - If time remains after pODI testing, give to Hydra observer Shporer
June 10-13, 2014 T&E
Plans for June 10:
Daytime:
- Instrument change from IAS to Hydra (Corson et al)
Nighttime:
- No on-sky activities
Plans for June 11:
Daytime:
- Instrument change cont'd (Corson et al)
Nighttime:
- ODI testing - ADC, Star tracker, guide star prediction, guider testing (Harbeck, Liu)
- Star Tracker testing (Rajagopal)
Plans for June 12:
Daytime:
- Bench reconfig (Willmarth, Liu)
- ODI shutter testing (Harbeck, Liu)
Nighttime:
- 1st 1/2 - ODI testing (Harbeck, Liu)
- 2nd 1/2 - Star tracker testing (Rajagopal)
Plans for June 13:
Daytime:
- Bench reconfig contingency (Willmarth, Liu)
- Potential ODI shutter work (Harbeck)
Nighttime:
- 1st 1/2 - ODI testing contingency (Harbeck, Liu)
- 2nd 1/2 - Star tracker testing contingency (Rajagopal)
- Saturday's observer is on standby in case of available time (Bastien/Stassun)
May 12-14, 2014 Generic T&E
**Note: IFU throughput testing has priority. Will reevaluate schedule Monday to determine what night is best for this according to weather forecast.
Plans for May 12:
Daytime:
- Bench reconfig for IFU testing (Harmer, Liu)
- Possible recollimation (Corson)
- Cool ODI (Corson)
Nighttime:
- 1st 1/2 - Star tracker testing (see notes here): determine best center of rotation for ODI; rotator angle vs el (Corson, Schweiker, Liu)
- 1st 1/2 - Potential M82 Observations - low priority (Liu)
- 2nd 1/2 - WHIRC observing (Kara Ponder on site)
Plans for May 13:
Daytime:
- Bench reconfig contingency (Harmer, Liu)
Nighttime:
- 1st 1/2 - WTTM testing: implement focus recommendation; frequency response (Corson)
- 1st 1/2 - Potential M82 Observations - low priority (Liu)
- 2nd 1/2 - WHIRC observing (Kara Ponder on site)
Plans for May 14:
Daytime:
- Bench reconfig contingency (Harmer, Liu)
Nighttime:
- 1st 1/2 - IFU throughput testing (Liu)
- 1st 1/2 - Potential M82 Observations - low priority (Liu)
- 2nd 1/2 - WHIRC observing (Kara Ponder on site)
April 10, 2014 WHIRC T&E
Plans for April 10:
Daytime:
- Secondary mount testing (Corson)
- ODI software testing (Harbeck)
Nighttime:
- WTTM/WHIRC testing [4-6 hours] (Jayadev, Behzad on call)
- --- a detailed lists of WTTM tests from Charles and Jayadev
- El mount testing [in parallel with WTTM testing] (Corson)
- ODI software testing (Harbeck)
- Star tracker testing [in parallel with ODI testing] (Jayadev)
**NOTE: SA visitors will be present.
March 10-13, 2014 Generic T&E
Plans for Mar 10:
Daytime:
- Hydra to IAS transition - TELESCOPE NOT USABLE AT NIGHT!
Plans for Mar 11:
Daytime:
- Hydra to IAS transition - TELESCOPE NOT USABLE AT NIGHT!
Plans for Mar 12:
Daytime:
- Hydra to IAS transition contigency
Nighttime:
- ODI testing (Harbeck)
- Wood-Vasey WHIRC observations (if time available)
Plans for Mar 13:
Daytime:
- Hydra to IAS transition contigency
Nighttime:
- Given to Wood-Vasey team (WHIRC)
- Harbeck may use 3 hours at the end of the night (contingency)
February 10-12, 2014 Generic T&E
Plans for Feb 10:
Daytime:
- M2 force testing (Corson)
- Bone install/testing (Behzad)
- Network switch work (Marshall)
Nighttime:
- ODI,NEO,etc testing/science (Jayadev, Harbeck)
- 2nd 1/2 - science (Friel)
Plans for February 11:
Daytime:
- M2 force testing cont'd (Corson)
Nighttime:
- Star tracker testing, pODI tests (Rajagopal, Schweiker, Harbeck)
Plans for February 12:
Daytime:
- Unscheduled
Nighttime:
- Contingency
- Given back to science (Friel)