November 18 & 19, 2015 Generic T&E
Plans for November 18
Daytime:
- No activities planned
Nighttime:
- ** Possible RoboAO laser testing - coordinate with 2-meter AO team.
- 1st 1/2: Testing the guiding performance of ODI. There's some elongation present along the elevation axis. The tests will be to eliminate or identify various factors: wind (if weather obliges: Wed night is forecast to be windy, Thursday calmer), ODI guiding commands and interaction with the TCS. (Harbeck, Rajagopal, Corson)
- 2nd 1/2: Either ST camera alignment or pointing model (OA)
Plans for November 19
Daytime:
- No activities planned
Nighttime:
- ** Possible RoboAO laser testing - coordinate with 2-meter AO team.
- 1st 1/2: Continue guiding tests (possibly in calmer conditions). Possibly test rotation guiding. (Harbeck and Corson)
- 2nd 1/2: Continue ST camera alignment or pointing model (OA)
- Potential ODI colllimation measurements (Harbeck)
- Potential software testing (Carole)
November 2 & 3, 2nd 1/2 nights
Daytime:
- No activities planned
Nighttime:
- ODI optical tuning - will take ~ 1/2 night (Harbeck, Corson)
- Pointing camera recalibration - WHIRC & ODI
- Wavefront camera testing (if time allows)
October 20, 2015
***All T&E plans abandoned due to weather and sick staff***. Entirety of night given to DSSI testing and checkout.
Daytime:
- ODI filter arm preload tuning (Harbeck, EM?)
Nighttime:
- ODI optical tuning - will take ~ 1/2 night (Harbeck, Corson)
- Pointing camera recalibration - WHIRC & ODI
- Wavefront camera testing (if time allows)
- DSSI testing as needed ~1 hour (Horsch)
September 30, 2015
Nighttime:
- ODI Collimation verification (Harbeck, Corson)
- Pointing tests (OA, Corson)
- MOS port wavefronting - check astigmatism (OA, Corson)
- WHIRC testing (Joyce)
September 23-25, 2015
Daytime:
- Instrument change from Hydra to IAS
Nighttime:
- IAS systems verification (OA, Corson)
- Pointing tests and Azimuth tuning (OA, Corson)
- Wavefront testing and ODI port collimation (OA, Corson, Harbeck)
August 3-28, 2015 SHUTDOWN
WEEK 1: Aug 3 - 7
Aug 3
- ODI removal (Harbeck, Liu, Hansey, Stupak)
- Tertiary/Secondary Regulator removal (Hansey, Lane)
- "Safe" facility (computer/instrument shutdown) (Hansey, OAs)
Aug 4
- ODI filter drive unit C installed (Harbeck, Liu, Hansey, Stupak)
Aug 5-7
- PMS Actuator cards (Donaldson, EM, LimitedCorson)
- Note, this task may continue throughout shutdown at a low level
WEEK 2: Aug 10 - 14
- AZ drive modules (Reddell, LimitedCorson, Moreno, Mech)
WEEK 3: Aug 17 - 21
- Pump/cool STA1
- AC Power cord replacement in wrap-up (Feriend)
- Simmons camera testing (Harmer, Willmarth)
- Contingency
WEEK 4: Aug 24-28
Aug 24-25
- ODI port collimation (Reddell, Corson, Harbeck, Stupak, Hansey)
Aug 25-28
- Daytime: Contingency
- Nighttime: T&E, On-Sky checkout (OAs)
- Nighttime: ODI collimation verification (Harbeck)
TO BE FIT IN AS TIME ALLOWS:
- Drain PMS & install new reservoir tank (Stupak, Hansey, Corson)
- Thermal Sensor investigation (Hansey, Stupak, Corson)
July 6-9, 2015 ODI Commissioning
Commissioning tasks completed by Jayadev, Daniel, Wilson
June 22-25, 2015 ODI Commissioning
Commissioning tasks completed by Jayadev, Daniel, Wilson
June 1-4, 2015 ODI Commissioning
Commissioning tasks completed by Jayadev, Daniel, Wilson
May 29-30, 2015 (1/2 nights):
Nighttime:
- ODI functional testing
May 27-28, 2015:
Daytime:
- ODI Installation
Nighttime:
- NO WORK SCHEDULED. Facility closed.
May 4-7, 2015
Plans for May 4-6
Daytime:
- Instrument change from IAS to Hydra
Nighttime:
- No nighttime activities scheduled
Plans for May 7
Daytime:
- Contingency for IAS to Hydra change
Nighttime:
- If not needed for checkout of Hydra/telescope systems give to Friday's observers for science
April 28, 2015 (1/2 night):
Nighttime:
- IFU mapping fibers to slit positions (Harmer)
April 6-7, 2015
Plans for April 6:
Daytime:
- Repair WTTM broken feed slide (Corson/EM)
Nighttime:
- Azimuth encoder characterization and tuning
- Telescope pointing investigation
- Pointing camera tests
Plans for April 7:
Daytime:
- No activities planned
Nighttime:
- Pointing maps (OA)
- Telescope pointing tests
- QSO data with WHIRC
March 30, April 1, April 3-4, 2015 (partial nights)
Nighttime:
- Characterizing pointing and azimuth instability
- Gather data for pointing camera model
- Plans to reinstall maypole (did not complete due to further azimuth investigations)
March 9-12, 2015
Plans for May 9-12:
Daytime:
- Instrument change from Hydra to IAS
Nighttime:
- Azimuth encoder tuning
- Telescope pointing investigation
- Pointing camera tests
March 2-3, 2015 Generic T&E
Plans for March 2-3:
Daytime:
- Hydra z-axis issue investigation
- Azimuth tuning
Nighttime:
- Azimuth characterization (Corson, OA)
February 2-3, 2015 Generic T&E
Plans for February 2:
Daytime:
- Maypole cable draping (Corson, Brent)
- Bench spectrograph reconfig (Harmer)
Nighttime:
- Pointing tests (Corson, Jayadev)
- Star tracker testing (Jayadev, Schweiker)
Plans for February 3:
Daytime:
- Maypole cable work contingency (Corson)
- Bench spectrograph reconfig (Harmer)
Nighttime:
- Pointing tests continued (Corson, Jayadev)
- Star tracker testing continued (Jayadev, Schweiker)