WIYN Observatory Document Index

To see what's new click here.

Document number WODC 00-02

1. Introduction

The WIYN Observatory Documentation Control (WODC) index contains a body of information on the project dating from its inception to the present. The index is organized into Top-Level Documents that define the project, Technical Reports - publications and formal reports about the project, and internal Technical Notes, less formal engineering reports about the project.

Where possible and as time permits we will make some of these documents available on line. However, at present most are available only by requesting hard copies. A master file of WODC documents is kept at the project offices at NOAO. To request copies of individual documents contact Pat Patterson (kpno@noao.edu).

2. Purpose & Scope

The purpose of this document is to define the document control used on the WIYN 3.5 Meter Telescope Project and to provide a list of controlled documents.

3. Numbering System

Each document will be given a unique WIYN Observatory document control (WODC) code. Each code will consist of three groups of numbers separated by hyphens. The first number will place the document in the hierarchy of document types, ie. top-level requirements (00), design requirements (01), technical reports (02) and technical notes (03). The second will be the document's serial number within its type, and the fourth number will give the revision. For example, the second revision of the Scientific and Technical Requirements Document has the code WODC 00-01-02.

4. Approvals & Revisions

The Scientific and Technical Requirements document contains the system requirements for the telescope, instrumentation, and enclosure to meet the science goals of the project. It is approved by the WIYN Board on the recommendation of the project manager and Scientific Advisory Committee (SAC). Changes to the Scientific Technical Requirements may be jointly approved by the Project Manager and SAC if, in their judgement, the changes do not significantly degrade the performance or capabilities of the observatory. Changes that would reduce the performance or capabilities or otherwise increase the cost of the project will be submitted to the Board for approval.

Design requirements documents contain requirements and specifications for individual subsystems. They are approved by the project manager, SAC and one other individual who is typically the the lead engineer in charge of the subsystem but in some cases an individual appointed by the SAC to oversee the development. Once approved, revisions to the Scientific and Technical Requirements and design requirement documents and the required approvals will be recorded on forms and kept in the project files by the project manager.

Technical reports and notes will be issued with the project manager's approval. The index, section 5 of this document, may be updated without Board approval.

5. Index

Top-Level Documents

00-01 Scientific & Technical Requirements
Matt Johns, revision 5 6/2/92
00-02 WIYN Observatory Document Index (this document)
Matt Johns, revised by Dan Blanco, revision 32 7/20/95
00-03 WIYN Resources Allocation Policy
Dave Sawyer, 9/22/95
00-04 New Instrumentation Policy
Dave Sawyer, 9/22/95
00-05 Instrument Support Policy
Dave Sawyer, 9/22/95
00-06 Operations Readiness Review Final Report
Dave Silva, 10/8/96
00-07 Guidelines for Scheduling Instrument Support
Dave Sawyer, 7/31/96
00-08 WIYN Project Oversight Process
Art Code, 5/28/98

Design Requirements

01-01 System Definition & Configuration
John Little, revision 2, 6/92
01-10 Telescope Mount Subassembly
Matt Johns, revision 11, 8/7/91
01-12 Primary Mirror Interface Specifications
Matt Johns, revision 8, 4/16/92
01-13 Secondary Mirror Subassembly
Dan Blanco, revision 2, 10/23/91
01-14 Tertiary Mirror Subassembly
Dan Blanco, revision 2, 11/91
01-15 Nasmyth Instrument Rotator
Matt Johns, revision 2, 5/1/91
01-16 Primary Mirror Cover
Dan Blanco, revision 3, 11/91
01-17 Counterweight Assembly
Dan Blanco, 7/24/92
01-18 Instrument Adapter Subsystem
John Little, revision 9, 3/27/92
01-19 Instrument Adapter Subsystem Interface
John Little, revised by Shelby Gott, revision 5, 1/25/96
01-20 Control System
Matt Johns, revision 11, 6/6/94
01-21 Science Instrument Interface Requirements
Matt Johns, DRAFT revision 2, 7/20/92
01-22 Graphical User Interface
Matt Johns, DRAFT revision 2, 1/28/94
01-30 Primary Mirror Cart
Dan Blanco, revision 2, 5/1/91
01-40 Enclosure & Control Building
Matt Johns, revision 2, 5/1/91
01-41 Secondary focus/tilt process (Sectilt)
Dan Blanco, 5/9/95
01-42 IAS Command Line Interface
Dan Blanco, 7/20/95
01-43 WIYN Cassegrain Instrument Adapter System
D. Sawyer and C. Anderson, March 5, 1998
01-44 Dual Instrument Filter-Shutter subassembly Design Requirements
D. Sawyer, May 28, 1998

Technical Reports

02-01 Optical Alignment
Matt Johns, DRAFT,4/12/91
02-02 Enclosure Thermal Performance
Matt Johns, DRAFT revision 2, 5/1/91
02-03 Telescope Preliminary Design Study
Steve Gunnels, June 1990
02-04 Mirror Removal Procedures
Superceded by 03-22 WIYN Primary Mirror Handling Procedures
02-05 Tertiary blank selection study for the WIYN 3.5 Meter telescope
Dan Blanco, revision 2, 8/9/93
02-06 Azimuth Bearing Study
Matt Johns, 5/22/91
02-07 Preliminary Design WIYN 3.5 Meter Telescope
Steve Gunnels, June, 1991
02-08 Secondary blank selection study
Dan Blanco, 7/22/91
02-10 Azimuth & altitude Servo Drive Analysis
Alan Schier, 5/23/1991
02-12 Fabrication of the WIYN 3.5-m Primary Mirror - producing an accurate sphere
G. Poczulp, L. Step, J. Richardson in Proc. of the SPIE 1618, p30 (1991)
02-13 Temperature Control of the 3.5-meter WIYN Telescope Primary Mirror
Larry Goble, in Analysis of Optical Structures, Proc. of the SPIE 1532, p161 (7/23/1991)
02-14 Active optics system for the 3.5-m structured mirror
L. Stepp, N. Roddier, D. Dryden and Cho, M. K., published in proceedings of the SPIE 1542, p256 (1991)
02-15 3.5m Mirror Project at NOAO
Larry Stepp, published in proceedings of the SPIE, volume 1236, 615 (1990)
02-16 Surface distortions of a 3.5M mirror subjected to thermal variations
Myung Cho, G. Poczulp, in Analysis of Optical Structures, D. O'Shea, ed., Proc. SPIE 1532, p137 (1991).
02-17 NOAO testing procedures for large optics
L. Stepp, G. Poczulp, E. Pearson, N. Roddier in Large Optics II, R. Parks, ed., Proc. SPIE 1618, p78 (1991).
02-18 Stress at the support interface of a 3.5m borosilicate honeycomb mirror
W.Y. Wong, April 30, 1990
02-19 Development of an athermal central support hub for the WIYN secondary mirror.
Dan Blanco, revision 2, 7/29/92
02-20 WIYN Project: 3.5 m Telescope on Kitt Peak.
Remote Observing Conference Report.
02-21 Results of Testing the 3.5M WIYN Telescope Primary Mirror and its Support, Thermal Control and Active Optics Systems
NOAO Preprint 447.
02-22 Detail Design Finite Element Analysis of the WIYN 3.5 M Telescope
Steve Gunnels, December, 1992
02-23 Design of the WIYN Atmospheric Dispersion Corrector.
Liang Ming, revision 2, June 21, 1993
02-24 Support System for the WIYN Tertiary Mirror
Dan Blanco, 7/93
02-25 WIYN 3.5 Meter Telescope Project
Matt Johns and Dan Blanco, in Advanced Technology Telescopes V, L. Stepp, ed., Proc. SPIE, 2199, p2 (March 1994)
02-26 Modifying Hydra for the WIYN Telescope
Sam Barden, published in proceedings of the SPIE, volume 2199
02-27 Thermal Design of the WIYN 3.5 M Telescope Enclosure
Dan Blanco and Matt Johns, in Advanced Technology Telescopes V, L. Stepp, ed., Proc.SPIE, 2199, March, 1994
02-28 Encoder Alignment Procedure
Dave Sawyer, unreleased DRAFT
02-29 The performance of the WIYN fiber-fed MOS system -- Hydra
Sam Barden and Taft Armandroff, published in proceedings of the SPIE, volume ??, 1994
02-30 The WIYN telescope active optics system
Nick Roddier, Dan Blanco, Larry Goble, Claude Roddier published in proceedings of the SPIE volume 2479, April 1995
02-31 Remote Observing from the Bottom Up: The Architecture of the WIYN Telescope Control System
Jeff Percival, published in proceedings of the SPIE volume 2479, April 1995
02-32 Disturbance rejection of the WIYN telescope position control servosystem
Scott Ellington, published in proceedings of the SPIE volume 2479, April 1995
02-33 The WIYN telescope graphical user interface
Dave Mills, published in proceedings of the SPIE volume 2479, April 1995
02-34 Fabrication and testing of the 3.5m, f/1.75 WIYN primary mirror
D. Anderson, J. Burge, D. Ketelson, B. Martin, S. West, G. Poczulp, J. Richardson, W. Wong, published in Proceedings of the SPIE, 2199, p193 (1994)
02-35 WIYN 3.5 M Primary Mirror Final Report
Steward Observatory Mirror Lab, May 5 1993
02-36 Procedure and Final Verification for the WIYN Secondary
Contraves USA TR-28957 rev A, 11/29/93
02-38 ORR Review of Scientific and Technical Requirements
D. Blanco, D. Sawyer, 2/1/96
02-39 ORR Review of Control System Design Requirements
D. Silva, J. Lewis, J. Percival, 2/1/96
02-40 ORR Review of IAS Design Requirements
D. Blanco, 2/1/96
02-41 ORR - MOS/Hydra
S. Barden, 2/1/96
02-42 ORR Presentation Material
Silva et. al., 2/1/96
02-43 Status Report on the WIYN Reimager and Spectropolarimeter
A. Code, 2/28/96
02-44 Preserving Mirror Coating Performance at WIYN
D. Sawyer and L. Reddell, September 3, 1997
02-45 A Study of the Radiance of the Fibers on the WIYN Hydra Multiple Object Spectrograph and DensePak Array
C. Conselice, P. Smith, D. Sawyer, 8/98

Technical Notes

03-01 Secondary Mirror Blank Specifications
Dan Blanco, revision 2, 8/26/91
03-02 Tolerances for the WIYN primary & secondary mirrors
Dan Blanco, revision 2, December 19, 1991
03-03 Telescope Cabling
John Little, revision 6 9/24/92
03-04 Grounding Policy
John Little, DRAFT, 10/10/91
03-07 Summary Description-NOAO 3.5 M Mirror Support Design
L. Stepp, October 1, 1991
03-09 Tertiary Mirror Blank Specifications
Dan Blanco, October 1, 1991
03-12 Preliminary tests-Secondary Mirror Focus/Tilt Actuator
Dan Blanco and John Little, May 4, 1993
03-13 Structure of the Instrument Adapter (IAS) Guide Box
Dan Blanco, April 23, 1993
03-14 A/R Coatings for the WIYN MOS Port Corrector
David Vaughnn, 7/12/93
03-15 Parametric Tolerances for the WIYN Wide Field Corrector
Dan Blanco, May 11, 1993
03-16 Wide-field Corrector Installation Tolerances
Dan Blanco, April 26, 1994
03-17 Elevation Axis Polar Moment of Inertia
Dan Blanco, August 6, 1994
03-18 As Built Optics
Dan Blanco and Charles Harmer, 5/5/95
03-19 Collimating the WIYN Telescope
Dan Blanco, January 30, 1996
03-20 Secondary Mirror Handling Procedures
Dan Blanco, January 30, 1996
03-21 Tertiary Mirror Handling Procedures
Dan Blanco, August 3, 1995
03-22 WIYN Primary Mirror Handling Procedures
Gary Poczulp and Dan Blanco, DRAFT, 2/14/94