January 2-4, 2018
Plan for January 2
Daytime:
- Instrument change from Hydra to IAS
Nighttime:
- No activities planned
Plan for January 3
Daytime:
- Instrument change continued
- VPH grating checkout/training
- Facility construction TBD
Nighttime:
- Pointing maps - OA
Plan for January 4
Daytime:
- Cool ODI & WHIRC
- Facility construction TBD
Nighttime:
- WHIRC/WTTM, WIFOE, ODI checkouts
- Wavefronts - OA
May 22-23, 2017 T&E
Plan for May 22
Daytime:
- Instrument change from IAS to Hydra
Nighttime:
- No activities planned
Plan for May 23
Daytime:
- Instrument change continued
- Initial Hydra/telescope checkout
- Azimuth/Elevation Drive surface clean and checks
- Balance azimuth
Nighttime:
- Azimuth tuning, LVDTs checks, load cells as time allows
April 5-6, 2017 Generic T&E
Plan for April 5
Daytime:
- No activities planned
Nighttime:
- WTTM tip/tilt mirror check
- 12pt pointing map to verify archiver is working
- 72pt pointing map, tracking from North
- Tracking tests and Windshake tests
- 2:15am NESSI Observing
Plan for April 6
Daytime:
- ODI flat fields
Nighttime:
- ODI sky flats
- Update pointing model
- Continuation of pointing/tracking/windskake tests
March 6-8, 2017 Generic T&E
Plan for March 6
Daytime:
- Hydra removal (EM, Emily)
- WHIRC pumpdown (EM)
- NESSI mods (Mark E, Nic S)
Nighttime:
- Telescope not usable
Plan for March 7
Daytime:
- IAS install (EM, Emily)
- WHIRC/NESSI install (EM, Emily, Mark, Nic)
- TCS update (Erik)
- Computer room assessment and rearrangement (Rob, Erik)
- AZ balancing (Rob)
Nighttime:
- WHIRC/WTTM checkout (OA, Heidi, Rob)
- NESSI checkout (Mark, Nic)
- Pointing verification (OA, Rob)
- 72-point Pointing Map (OA)
- Tracking test (OA)
Plan for March 8
Daytime:
- Telemetry checks - Inclinometer/Load Cells/LVDT (Rob, Emily)
Nighttime:
- Wavefronts & ODI Coma check (Daniel, Rob, Emily)
- ODI Condensation check (Daniel)
- Lookup table test (OA, Rob, Emily)
February 6-7, 2017 Generic T&E
Daytime:
- Hydra work (Emily, Heidi, Erik, Rob)
- Z-axis / Gripper Checks
- Update procedures for adjusting axis and gripper assembly
- Check tolerances / adjustments (warmer operating temperatures)
- Elevation / Azimuth Drives (Cleaning / Inspection) (Emily, Heidi, Rob)
- Elevation Balancing (Checks / Overview) (Emily, Heidi, Rob) - AzLogger
- Azimuth Balancing (Check) Mech Level (Rob, Emily)
Nighttime:
- Pointing Verification
- Pointing Map (72 pt) (use wrap in the north)
- Verify / Check Hydra Changes
- Tracking Test - Stability
January 11-12, 2017 Generic T&E
Plan for January 11
Daytime:
- ODI Removal and Transport to IHF
- Azimuth Balancing and attitude measurements: LVDT/Load Cells/Inclinometers
Nighttime:
- 2 Full Pointing Maps using (N) as the wrap
1st with 4 deg/sec changes in Az
2nd with 2 deg/sec velocity changes
** During pointing tests - run azimuth logger
** NOTE: garage door / louvres (open / closed / partially open (approx. in feet))
Plan for January 12
Daytime:
- Evaluate Pointing Maps - Update Model
- Azimuth Drive Motor - Increase Clamping Force on the Friction Drive (Amount TBD)
- Azimuth Attitude Measurements: LVDT/Load Cells/Inclinometers
Nighttime:
- 2 Full Pointing Maps using (N) as the wrap
1st with 4 deg/sec changes in Az
2nd with 2 deg/sec velocity changes (potentially adjust this to 3 deg./sec)
** During pointing tests - run azimuth logger
** NOTE: garage door / louvres (open / closed / partially open (approx. in feet))
December 19-21, 2016 Generic T&E
Plan for December 19
Daytime:
- Remove IAS / Install Hydra
- ODI pumpdown initiated
Nighttime:
- Nothing scheduled
Plan for December 20
Daytime:
- Remove IAS/ Install Hydra cont'd
- Hydra checkout
- Azimuth Axis Checkout / Balancing
- ODI Cooldown initiated
Nighttime:
- Hydra Checkout - On sky (TBD)
- Dome Closed Observing (Azimuth Logger Running - Baseline Azimuth and Elevation Axis Parameters)
- Pointing Verification (25 pt. with Azimuth Logger Running - Please start a new file)
- ODI Tests - (Daniel / Wilson)
Plan for December 21
Daytime:
- ODI checkout
- Cass Port Tests - theodolite measurements
- Hydra - priority (TBD of previous days tests)
Nighttime:
- Hydra Checkout - On sky (TBD)
- ODI tests & observing (Daniel/Wilson/Jayadev)
- Pointing map (TBD)
November 16-17, 2016 Generic T&E
Plan for November 16
Daytime:
- Remove NESSI / Install WIFOE - Gradpk (EM - Mark Everett)
- WIFOE checkout (Susan or Di)
- Cass Port (NEID Port) Checkout (Emily - Rob)
Nighttime:
- WIFOE - Gradpk Checkout (OA, Susan or Di)
- WIFOE Camera images to estimate s/n for exposures of a few to tens of seconds (OA, Susan or Di)
- Pointing verification 25 points with Azimuth Logger running (OA - Rob)
Plan for November 17
Daytime:
- sectilt.tcl checkout and adjust (Jayadev - Erik)
- Az / El Checkout and Balancing (Rob - Bob S.)
Nighttime:
- sectilt checkout (wavefronts) (OA - Erik)
- WHIRC WTTM - checkout tip-tilt guide mirror (OA / EM)
- Pointing verification 25 points with Azimuth Logger running (OA - Rob)
June 21-22, 2016 Generic T&E
Plan for June 20
Daytime:
- ODI - improved baffle flat field data acquisition (Daniel)
Nighttime:
- ODI narrow band IQ evaluation (Daniel)
- Exploration of secondary coma correction process based on ODI wave front imaging (Daniel)
- Pointing verification (OA)
Plan for June 21
Daytime:
- ODI - improved baffle flat field data acquisition (Daniel)
Nighttime:
- Contingency. If not needed, given back to science (WOCS program with Hydra)
May 16-21, 2016 Generic T&E
Note: No daytime plans during this T&E. Only 1st 1/2 nights available for T&E
Plan for May 16
Nighttime:
- WHIRC script testing (OA)
Plan for May 17
Nighttime:
- New pointing map installation/test (JR/HS)
Plan for May 18
Nighttime:
- New pointing map installation/test [backup night](Jayadev/Heidi)
- If not needed for pointing tests, ODI test will commence (Harbeck)
Plan for May 19
Nighttime:
- Hexpak/Gradpak tests (Harmer/Willmarth)
Plan for May 20
Nighttime:
- Hexpak/Gradpak tests [backup night](Harmer/Willmarth)
- If not needed for IFU tests, ODI test will commence (Harbeck)
Plan for May 21
Nighttime:
- WHIRC tests & startup (Joyce)
April 25-26, 2016 Generic T&E
Plans for April 25
Daytime:
- AZ tuning investigations (PDunlop, LReddell)
Nighttime:
- ODI testing ~1hr (Harbeck)
- DSSI queue (Howell, Everett)
Plans for April 26
Daytime:
- AZ tuning investigations (PDunlop, LReddell)
Nighttime:
- Given to back to science (Salzer)
January 26 & 27, 2016 Generic T&E
Plans for January 26
Daytime:
- Hydra gripper cleaning (EM)
Nighttime:
- ODI U-band photometric calibration (Daniel/Wilson)
- ODI rotational guiding tests (Daniel/Wilson)
- 2nd 1/2: OA testing TBD (OA)
Plans for January 27
Daytime:
- ODI dome flat testing (Daniel/Wilson)
Nighttime:
- Contingency for ODI tests (Daniel/Wilson)
- Simmons camera testing (Di)
- OA testing TBD (OA)